FieldSync Leverages Digital Twins to Improve Tower Inspection Processes

By |2024-09-25T16:12:23+00:00September 25th, 2024|Case Studies, Case Study, OpenTower iQ|

FieldSync Technologies Case Study Overview Organization: FieldSync Technologies Location: Wheat Ridge, Colorado, USA Project Objectives: To digitize data collection and site analytics for lifecycle tower asset management. To establish digital twins to maximize the value of tower site assessments. Products Used: OpenTower iQ   Modernizing Tower Inspection and Analysis Workflows In the fast-evolving telecommunications sector,

Johnson Broderick Engineering Assess the Value of Precision Graphics-Enabled Tower Analysis

By |2023-09-07T16:46:57+00:00June 18th, 2021|Case Studies, Case Study, OpenTower Designer|

Johnson Broderick Engineering Case Study Overview Organization: Johnson Broderick Engineering, LLC Location: Eugene, Oregon, USA Project Objectives: Accurate graphical representations of towers Ability to optimize analysis by evaluating multi-variable simulations Integrated solution, including tower, mount, and foundation analysis Products Used: OpenTower Designer   The Visual, Virtual Difference Structural tower analysis has long been a tedious

Genesys International Uses Digital Twins to Increase Accuracy of Tower Inspections

By |2022-08-17T17:23:45+00:00May 10th, 2021|Case Studies, Case Study, OpenTower iQ|

Genesys Case Study Overview Organization: Genesys International Corporation, Ltd. Location: Mumbai, India Project Objectives: Perform inventory management through inspection automation Facilitate planning for a next generation 5G network Enable downstream workflow for engineering and BIM Products Used: OpenTower iQ   Facilitating a Previously Labor Intensive Process Due to the ever-increasing demand for data along with

Tower Engineering Professionals Optimize Workflows with OpenTower

By |2022-08-17T17:31:18+00:00February 10th, 2021|Case Studies, Case Study, OpenTower Designer|

Tower Engineering Professionals Case Study Overview Organization: Tower Engineering Professionals, Inc. Solution: Communication Towers Project Objectives: To make countless communication tower modifications quickly. Products Used: OpenTower Designer   Minimizing Time and Maximizing Profits With the advancement of 4G and build-out of the 5G network occurring at about the same point in time for multiple carriers—and

Go to Top